Construction concrete quantity calculation Excel template
Calculate the concrete volume from the number, length, width and height of rectangular elements. See the net meter square meter with deducted spaces.
Prepared by:Shiftmate Product and Operations Team · Son kontrol:
Actual file previews
The images below are the actual data entry and executive summary pages of the workbook to be downloaded.


Step by step usage
Examine the example and prepare the blank file
Each row is a group of rectangular prism elements with the same dimensions. Enter all measurements in metres; For 20 cm, type 0.20. The quantity must be an integer. The space column is not a single element, but the total volume to be deducted for all elements in that row. Identify its location in the project with the location and element code. Use the yellow input fields on the tracking page; Do not change the blue formula fields. The sample sheet is filled with fictitious records and does not count towards the actual work total.
Write actual records in the yellow fields
Gross volume is pieces × length × width × height. Net volume is gross volume minus total space. If the clearance exceeds the gross volume or the measurement is not positive, a control warning occurs. Summary gives the total gross and net m³ of valid rows. In rounding view it is two decimals; Measurement precision within the calculation is preserved. An empty mandatory field is distinguished from a real zero. Correct missing or incorrect records in the control column; Since these lines are excluded from the summary, do not use the total as a final report until the problem is resolved.
Fix control alerts and review summary
Compare the dimensions with the current project. Check for repeated elements and spaces.
What does this Excel file solve?
Calculate the concrete volume from the number, length, width and height of rectangular elements. See the net meter square meter with deducted spaces. Each row is a group of rectangular prism elements with the same dimensions. Enter all measurements in metres; For 20 cm, type 0.20. The quantity must be an integer. The space column is not a single element, but the total volume to be deducted for all elements in that row. Identify its location in the project with the location and element code. Use the yellow input fields on the tracking page; Do not change the blue formula fields. The sample sheet is filled with fictitious records and does not count towards the actual work total.
What's inside the file?
Gross volume m³, Net volume m³, Quantity record summary. The file contains sample rows, canned formulas, data validation fields, risk colorings, and executive summary.
Calculation and control logic
Gross volume is pieces × length × width × height. Net volume is gross volume minus total space. If the clearance exceeds the gross volume or the measurement is not positive, a control warning occurs. Summary gives the total gross and net m³ of valid rows. In rounding view it is two decimals; Measurement precision within the calculation is preserved. An empty mandatory field is distinguished from a real zero. Correct missing or incorrect records in the control column; Since these lines are excluded from the summary, do not use the total as a final report until the problem is resolved.
Worked example: Construction concrete quantity calculation: calculation example
4 elements. 2m × 0.30m × 0.50m. Total space 0.10 m³. Result: The gross volume is calculated as 1.20 m³ and the net volume as 1.10 m³.
Decisions that can be taken as a result of this
Compare the dimensions with the current project. Check for repeated elements and spaces
Common usage mistakes
Entering 30 m instead of 30 cm. Mistaking a single element space for a total space. Using the summary total as the final result without correcting the lines with control warnings
Limits and proper use
It calculates only rectangular prism geometry. It is not static design, reinforcement calculation, application security or official quantity survey approval. The authorized technical person must evaluate the intersecting elements and project details. The file is prepared for 150 record lines. The parent summary includes all valid rows, regardless of filters. When capacity is full, open a new period copy; additional rows require the summary and validation ranges to be updated as well. There are no macros, external data connections or automatic notifications.
Compatibility and quality control
Two pages of this file were visually inspected; Formulas were recalculated and checked in empty, sample and incorrect entry scenarios. There was no separate device testing of the Excel desktop application. .xlsx without macro; formulas and drop-down lists are included in the file. The tracking page includes 150 preset record lines and a standalone Sample page. Prepared for desktop Excel; Check views and validations in other spreadsheet applications.
Scope of this file
This independent file has been prepared for construction concrete quantity calculation. It's not that Shiftmate automates this industry workflow; The application focuses on team, shift and timesheet management.
Relevant official and technical resources
Frequently asked questions
Is there a circular column calculation?
No. This template is for rectangular cross-section members. Do not use circular or irregular geometries by entering them as rectangles.
Does it add wastage for concrete order?
No. It gives the net geometric volume. Order share and application conditions should be evaluated separately.
Can I write centimeters?
Convert to meters first. For example, 25 cm is entered as 0.25 m. The file does not automatically detect the unit of measurement.
Do I need to create an account to download the file?
No. You can download the Excel file directly after creating a download request with your email address. Creating a workspace is not mandatory. If there is an area that does not meet your needs, you can request an edit via the contact form.