Shiftmate

Schedule adherence calculator

Calculate adherence rate and target difference from planned and adhered study minutes.

Prepared by:Shiftmate Product and Operations Team · Son kontrol:

Step by step usage

  1. Enter actual period data

    Replace the sample values with your own business's data for the same date range and the same unit of measure.

  2. Read the result and assumptions together

    The planned working time is compared with the time during which the employee performs the correct activity. Shows vehicle compliance rate, off-plan minutes and target difference. Examine the result not just as a single number but for its sensitivity to change in inputs.

  3. Save the scenario and measure again

    Once you make a decision, write down the input and the date. Match the minute definition to your WFM system. Examine patterns rather than single days. Separate system or plan failure from employee behavior.

What does this tool calculate?

Calculate adherence rate and target difference from planned and adhered study minutes.

formula

Schedule adherence = scheduled minutes / scheduled minutes × 100

Calculation method

The planned working time is compared with the time during which the employee performs the correct activity. Shows vehicle compliance rate, off-plan minutes and target difference.

Worked example

Planned: 420 minutes. On schedule: 386 minutes. Target: 92%. Result: Adherence is 91.9%, off-plan time is 34 minutes and goal difference is approximately -0.1 points.

How should the result be interpreted?

Match the minute definition to your WFM system. Examine patterns rather than single days. Separate system or plan error from employee behavior

Common usage mistakes

Automatically counting login time as adherence. Not processing the plan change into the system. Using very short interval results as punitive

Limits of the model

Adherence is not quality or productivity; It only shows time compliance with the planned activity.

Is your data safe?

Calculation and file analysis runs in your browser. The operation files you upload are not sent to a server by this tool.

Relevant official and technical resources

Frequently asked questions

Does high adherence mean high performance?

No. Quality, solution, customer experience and productivity are separate metrics.

Does approved shift change reduce the rate?

If the plan is not updated in the system, it may drop; Use the last valid plan before measuring actual.