Shiftmate

Effect of leave request on shift coverage

Simulate remaining team capacity and open shift risk by person on leave and role.

Prepared by:Shiftmate Product and Operations Team · Son kontrol:

Step by step usage

  1. Enter actual period data

    Replace the sample values with your own business's data for the same date range and the same unit of measure.

  2. Read the result and assumptions together

    For each role, the planned person, allowed person, and safe minimum are compared. A negative difference indicates a role gap that may occur if the leave is approved. Examine the result not just as a single number but for its sensitivity to change in inputs.

  3. Save the scenario and measure again

    Once you make a decision, write down the input and the date. Use role minimum instead of total team. Check the skill level of people on leave. Prepare the alternate shift prior to approval.

What does this tool calculate?

Simulate remaining team capacity and open shift risk by person on leave and role.

formula

Remaining capacity = scheduled employee - furloughed employee; difference = remaining capacity - role minimum

Calculation method

For each role, the planned person, allowed person, and safe minimum are compared. A negative difference indicates a role gap that may occur if the leave is approved.

Worked example

Kitchen plan: 5 people. Permission: 2 people. Minimum: 4 people. Result: The remaining capacity is 3 and the difference is -1; the manager evaluates the day off, shift change, or additional coverage option.

How should the result be interpreted?

Use role minimum instead of total team. Check the skill level of people on leave. Prepare the alternate shift before approval

Common usage mistakes

Including open shift in the planned number. Considering the same person in two role capacities. Accepting the minimum as constant even if the density changes

Limits of the model

The tool does not grant permission rights or approval decisions; Shows the operation impact only for the selected date and role.

Is your data safe?

Calculation and file analysis runs in your browser. The operation files you upload are not sent to a server by this tool.

Relevant official and technical resources

Frequently asked questions

Does a negative difference mean permission denial?

No. It is a warning to consider alternatives such as shift change, support from another branch or task arrangement.

How should a multi-competent employee be counted?

Count in only one active role capacity at a time; Consider the task transition separately according to the planned time interval.